Fire Systems Permit




Anyone seeking a Fire Systems Permit must secure the typical commercial permits for construction as well as the following based on the exact project:

Fire Alarm System:
-2 Sets of Design Plans, signed/sealed if over $5,000 valuation
-2 Sets of Specifications/Technical Documents

Fire Sprinkler System:
-2 Sets of Design Plans, signed/sealed over 50 heads
-2 Sets of Hydraulic Calculations
-No permit is required for relocating up to 3 heads

Fire Suppression System
-3 Sets of Design Plans, signed/sealed for over $5,000 valuation
-3 Sets of Specifications/Technical Documents

Exhaust Hoods:
-2 Sets of Design Plans, (pre-engineered) not signed/sealed
-2 Sets of Specifications/Technical Documents (pre-engineered)
-2 Sets of Construction Plans (Site Built) signed/sealed

Standpipe System:
-2 Sets of Design Plans, signed/sealed for over $5,000 valuation
-2 Sets of Hydraulic Calculations

Fire Pump:
-2 Sets of Design Plans, signed/sealed for over $5,000 valuation
-2 Sets of Hydraulic Calculations

Fire Protection System Demolition:
-2 Letters of Intent (all removals/disconnects)
-Scope of Work Statement

Paint Spray Booth
-2 Sets of Design Plans, (pre-engineered) not signed/sealed
-2 Sets of Specifications/Technical Documents (pre-engineered)
-2 Sets of Construction Plans (Site Built) signed/sealed

Tank Installations - Any Type:
-2 Sets of Design Plans, (pre-engineered) not signed/sealed
-2 Sets of Specifications/Technical Documents (pre-engineered)
-2 Sets of Construction Plans (Site Built) signed/sealed

Tank Removal - Any Type:
-2 Sets of Site Plans
-2 Letters of Intent
-Scope of Work Statement

For more information on this and all other permits you might need, contact us at Your Permit Solution!