Mobile home permits are typically required for the building and/or moving of any mobile home. Here are a few things you should know about the application and process:

  • You must note the electrical company furnishing electricity to the build site.
  • If you'll be using a septic tank, your septic tank permit number must be available.
  • You must include a plot plan which displays the following:
  1. The size of the lot where you're planning to build the home.
  2. Existing buildings on the property.
  3. Additions such as porches, sheds, etc.
  4. Set-backs on home from property line.
  5. A distinction between North, South, East and West.
  6. The width and length of the home.
  7. Where the well and septic tank will be placed (if applicable).
  8. Name of highway, street, or road that runs in front, back, and side of property.
  • You must also comply with a specific checklist to ensure the building is prepared for inspection after construction is complete.
For more information on this and other types of permits, visit our website!